PVC Film For Cooling Tower

The PVC Film For Cooling Tower is widely used in from small cooling towers to large cell and natural draught cooling towers;
Excellent heat and mass transfer ;
High resistance to erosion
Self supporting structure
Flexibility in material and dimensions
Long service life

  • LATINO
  • China
  • within 2 weeks
  • 500 m3/day
  • Information
  • Video
  • Download

cooling tower fillPVC Film For Cooling Tower


Production Specification

The circular tower packing is a crucial heat exchange component installed inside the circular cooling tower, achieving heat exchange by increasing the contact area between water and air. Its working principle includes two forms: counter-flow and cross-flow. The former uses the heat exchange method where air flows upward and water flows in the opposite direction, while the latter involves horizontal air flow through the packing and water for heat exchange.

This packing is made of materials such as polypropylene (PP) or polyvinyl chloride (PVC), and its selection depends on the pH value of the water quality, impurity content, and operating temperature. During installation, the size of individual modules should be controlled within 500mm×500mm, and a 3-5mm thermal expansion gap should be reserved. The horizontal deviation of the support beam should be ≤ 2mm/m.

The performance of the packing directly affects the economic operation of the cooling tower. Proper installation can increase the heat exchange efficiency by more than 10%, and the energy-saving effect can reach 6%. During maintenance, softened water or anti-scaling agents should be used, and using antibacterial packing can effectively control the growth of biofilms.

The circular tower packing achieves heat exchange by increasing the contact area between water and air. In counter-flow cooling towers, air and water flow in opposite directions, while in cross-flow type, horizontal air flow and falling water flow cross for heat exchange. Open cooling towers directly spray water onto the packing surface, while closed cooling towers use independent fluid circuits and achieve indirect cooling through the evaporation of water film outside the tube bundles.

The packing modules need to have a smooth surface and precise dimensions. The thickness error of a single piece should not exceed ±0.1mm to ensure uniform water flow distribution. The support frame needs to be treated for rust prevention, and the maximum gap after installation should not exceed 20mm.

  

Feature for the round cooling tower fill:

  

Resistance for high temperatures 

Little weight

Easy installation

Uses PVC or PP material which provides an excellent cooling effect and a longer lifespan

Thermal conductivity

The application range of Round Type Cooling Tower Fill Rolls:

New construction

Emergency repair

Thermal upgrade or reconstruction

Round cooling tower



PVC filler

cooling tower PVC fills



cooling tower fill

PVC filler


Related Cooling Tower Components:

cooling tower PVC fills


Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.


Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!

 cooling tower fill

PVC fillercooling tower PVC fills

cooling tower fill

PVC filler


Brand Strength
10 years cooling tower project revisiting from Latino
Production Equipment
Production Equipment
Test Lab and quality control process
Test Lab and quality control process
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.